Cart(0)
Timeless Essentials for Modern Living
Timeless Essentials for Modern Living Timeless Essentials for Modern Living
Sharkskin Chillproof Shortsleeve Chest Zip Female

Sharkskin Chillproof Shortsleeve Chest Zip Female

  • 14
  • 10
  • 12
  • 16
  • 18
  • 20
  • 22
  • 6
  • 8

$ 65.44

$ 50.34

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

Product Details

Sharkskin Chillproof Shortsleeve Chest Zip Female

 

These 100% Chillproof longpants are equally suitable teamed up with a Sharkskin top, under a Drysuit, or under drypants for kayaking. They are cut with a high rear waist for comfort and warmth, provide protection from chafing when dry, and provide peace of mind knowing that if you do get wet you will still be warm. Chillproof longpants can be worn in combination with all other Sharkskin tops.

About Chillproof

Chillproof is an aquatic specific windchill proof, 3-layer composite material with the thermal properties of a 2.5 to 3mm neoprene wetsuit but without many of the drawbacks of traditional wetsuits. Chillproof can be worn under a wetsuit for extra warmth and enhanced wind protection. Chillproof can also be worn by itself as the perfect watersports thermal wear or layered with other Sharkskin garments for extra warmth and insulation.

It is ideal for scuba diving and snorkelling, jet skiing, paddle watersports, board watersports, wind watersports, sailing and many other watersports.

Chillproof Features

  • Nylon/Spandex outer layer for superior durability and abrasion resistance.
  • 100% windproof and 10K breathable membrane to stop windchill to keep you warm yet regulate body temperature to avoid overheating.
  • Hollow fibre 'next to skin' fleece for warmth, comfort and superior moisture wicking properties.
  • Durable water repellent (DWR) finish to provide a protective shell that ‘sheds’ water.
  • 4-way stretch ensures garments are non-restrictive allowing a full range of movement and are easy to get on and off.
  • Non-chaffing, itch and odour resistant properties mean that garments can be worn for long periods of time.
  • Durable seam thread to resist deterioration in saltwater so the garment will last longer.
  • Neutrally buoyant so there is no need to add extra weight when diving.
  • SPF50 for sun protection to avoid skin damage and melanoma

 

PRODUCT VARIATION:

Available Colors:

  • Black , Reflection

Available Sizes:

  • Men and Women Sizing available.
  •  

 

Tags: Scuba Diving, Freediving, Water Sport, Exposure Protection, Wetsuit, Windproof, Neutral Buoyancy, 

 

Designed to last

We source the world’s most technically advanced materials, create the highest quality design and utilize the best manufacturing techniques to create garments that are built to last.

Eco Friendly

At SHARKSKIN we are passionate about watersports activities and we care about minimising our impact on the environment. We use biodegradable and compostable packaging bags, minimise waste in our manufacturing and design long lasting products.

 

Product you might also like

You May Also Like
Cart
Timeless Essentials for Modern Living
Your cart is currently empty.